For an LED grille screen, the first site decision is where the supporting frame can connect to the building. An open grille admits light and air, but the screen, cables and framing still carry weight and catch wind. The mounting position also determines how technicians will reach the display for service.
1. Choose the mounting position
| Standort | Question to settle on site |
|---|---|
| Aussenwand | Where is the load-bearing structure behind the finish, and can the anchors reach it? |
| Inside or outside a glass curtain wall | Which structural members may carry the frame, and will glass movement, cleaning or replacement be obstructed? |
| Roof or freestanding column | How will the support transfer wind forces to the building or foundation? |
| Suspended overhead | Which approved points carry the suspension, and how will the area below be kept clear during work? |

2. Coordinate the grille with the façade
Record the viewing direction from the street and the position of mullions, trees and signs. Mark the proposed frame and cable routes on an elevation drawing. Check a sample from both sides where daylight or the view through the grille matters.
Ask the structural engineer and façade designer to identify the support points and design loads for this site. Include the complete assembly and the manufacturer’s wind data. A single weight multiplier cannot establish whether an existing wall, bracket or anchor is suitable.
3. Plan access and inspection
Walk through one repair on the drawing. Show where a technician stands, which direction a strip or cabinet comes out, and how its connectors can be reached. Check that nearby glass, louvers and cladding leave that path clear.
Before lifting, agree on the work zone below and how pedestrian traffic will be separated. At handover, record the installed support locations, cable identification and the access route for future repairs.
4. Fazit
A grille installation is ready to proceed when the building team has accepted the supports and the display team can show how the modules will be installed, viewed and serviced. Resolve these points before drilling the façade or fabricating the frame.
5. Häufig gestellte Fragen
(1) Can an LED grille screen be attached directly to curtain-wall glass?
Only an engineered system specifically approved for that glazing assembly should transfer loads to the glass. Have the façade designer identify the permitted attachment points.
(2) Does an open grille still need a wind-load assessment?
Yes. Open area changes the forces on the assembly, and the frame and supports also see wind. Use the actual grille data and site exposure in the structural review.
(3) Should a grille screen go inside or outside the glass?
Compare reflections and visibility from the street, equipment exposure, cleaning access and the available removal path. A sample at the proposed position can resolve visibility questions before fabrication.